Skip to content
English - United Kingdom
  • There are no suggestions because the search field is empty.

First-Time Initialization and Setup of Mr Pure Control Unit

Step-by-step guide for first-time setup and calibration of the Mr Pure control unit.

When powering on the Mr Pure control unit for the first time or after factory reset, follow the initialization steps: select chlorine mode (Inverter, Auto pH, or Manual), calibrate ORP and pH probes using appropriate buffer solutions, set pool volume (5-150 m³), and configure local time. Use the touch screen to navigate and confirm each step. Skipping calibration is possible but not recommended. Proper setup ensures accurate monitoring and efficient chlorination. Remember to isolate the electrolytic cell by closing flow valves before probe calibration or replacement.